Wall tie replacement for Dover properties
Our Kent coverage takes in Dover (CT17) and nearby Folkestone, Deal and Canterbury. It is around 36 miles east of Maidstone.
If your Dover installation has a guarantee, we check it first; the guarantee route may cover the work. We never cold-call in Dover or anywhere else, and we do not work with doorstep claims companies.
Every elevation is judged on its own exposure. Much of Kent sits in the more sheltered driving-rain zones of the UK, which widens the choice of fill. Exposed elevations, coastal sites and high ground still get checked wall by wall.
On compliance, if cavity wall insulation follows in Dover, filling a cavity is notifiable building work and needs a building notice or competent-person self-certification.
Rules in England
Filling a cavity is notifiable building work and needs a building notice or competent-person self-certification if insulation work follows.
Sources: Planning Portal: cavity wall insulation and building regulations; CIGA: CWISC competent person scheme.
Signs of wall tie failure
Horizontal cracks in mortar joints at regular vertical intervals, bulging brickwork, or lifting of the roof verge. Older galvanised ties, especially in walls built before the 1980s, are the usual suspects.
What is included in Dover
- Remedial stainless ties to a set pattern
- Isolation or removal of old ties where needed
- Making good
- Tie inspection with metal detector and borescope
Guide prices for Dover
| Wall tie replacement guide prices | Guide price |
|---|---|
| Remedial wall ties, detached house | £1,995–£3,495 |
| Remedial wall ties, semi-detached house | £1,495–£2,495 |
| Remedial wall ties, terraced house | £995–£1,795 |
This work is not insulation, so it is normally standard-rated for VAT. Guide prices include VAT where it applies. Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
How it works in Dover:
Get in touch
Online, by phone or WhatsApp.
Your price
Confirmed in writing before you book.
The visit
Carried out at an agreed time, with photos of what we find.
Your report
Plain English, with any follow-on work quoted separately.