Social housing and estate programmes for Southampton properties
If your property is in Southampton or the SO14 district or nearby Hythe, Totton and Eastleigh, it is within our Hampshire coverage. Southampton is one of the main towns we cover in Hampshire.
Blocks of flats in Southampton are surveyed as a whole, because the cavity runs across every flat in the building. For commercial buildings in Southampton, the survey also considers building use and fire requirements before a material is specified.
Before any material is chosen, exposure is checked. Hampshire has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.
On compliance, in Southampton filling a cavity is notifiable building work and needs a building notice or competent-person self-certification.
Funding in England
In England, ECO4 runs to 31 December 2026 and Warm Homes: Local Grant supports low-income households through councils.
Sources: GOV.UK: extending the ECO4 end date, government response; GOV.UK: Warm Homes Plan.
What we provide
Stock surveys with a clear result per address, fixed rates per archetype, resident liaison, photo evidence before and after, and remediation of failed historic fills where diagnosis shows the fill is the problem.
What is included in Southampton
- Stock and archetype surveys
- Remediation programmes
- Per-address records
- Resident liaison
Guide prices for Southampton
| Social housing and estate programmes guide prices | Guide price |
|---|---|
| Commercial cavity fill, per m² (+VAT) | £22–£36 |
| Access towers or MEWP, per day (+VAT) | £195–£495 |
No VAT is charged on installing insulation in homes until 31 March 2027 (then 5%). Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
From enquiry to finish in Southampton:
Send your details
A minute online, or call the free number.
We check the walls
Construction, cavity width, debris, damp and wind-driven rain exposure.
You decide
Plain-English result and a fixed price, with no pressure to book.
Job done properly
Holes made good, paperwork handed over, guarantee details confirmed.