0800 088 6248
CavityWallInsulationUKCAVITYWALLINSULATIONUK.CO.UK
Cavity wall insulationCavity wall suitability surveyCavity wall insulation removalCavity insulation top-upDamp investigation after cavity insulationBonded polystyrene bead insulationBlown mineral wool insulationParty wall cavity insulationBorescope cavity inspectionCavity wall insulation for landlordsGrant and funding checkLoft insulation
Hampshire · England

Social housing and estate programmes in Hampshire

We arrange social housing and estate programmes throughout Hampshire, from Southampton to Portsmouth and Basingstoke. We survey, fill, top up and remediate cavity walls for housing associations, councils and managing agents, with property-by-property records that stand up to audit.

1970s low-rise housing estate of buff brick maisonettes and terraced houses

Free survey in Hampshire

Tell us about the property and we will arrange a free survey and a fixed price.

Enter a UK postcode.
Choose a service.
Enter your name.
Enter a phone number with at least 10 digits.
Enter a valid email address.

We use your details only to answer this enquiry and arrange your visit, sharing them only with the registered installer we appoint for your job and the providers named in our privacy notice. No marketing lists, no cold calls.

Social housing and estate programmes across Hampshire

We cover 18 towns in Hampshire, including Southampton, Portsmouth, Basingstoke, Gosport, Waterlooville and more.

Wind-driven rain is the first thing the surveyor weighs up. Hampshire has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.

Blocks of flats in Hampshire are surveyed as a whole, because the cavity runs across every flat in the building. For landlords and managing agents in Hampshire, we survey in batches and return a result sheet and fixed price per address.

Building Regulations in England

Filling an existing cavity wall is notifiable building work in England. Either a building notice goes to building control before the work, or the installer self-certifies it through a government-approved competent person scheme such as CIGA's CWISC scheme. The insulation used must also be suitable for the wall it goes into, which is why the survey checks construction, condition and exposure first.

Funding in England

  • ECO4, the energy-supplier scheme, has been extended to 31 December 2026 and government has said there will be no successor supplier obligation.
  • The Great British Insulation Scheme closed as planned on 31 March 2026.
  • Warm Homes: Local Grant supports low-income households in England through councils, and the January 2026 Warm Homes Plan sets out fully funded upgrades for low-income homes, with more detail still being published.

Sources: Planning Portal: cavity wall insulation and building regulations; CIGA: CWISC competent person scheme; GOV.UK: extending the ECO4 end date, government response; GOV.UK: Warm Homes Plan.

What we provide

Stock surveys with a clear result per address, fixed rates per archetype, resident liaison, photo evidence before and after, and remediation of failed historic fills where diagnosis shows the fill is the problem.

What is included

  • Stock and archetype surveys
  • Resident liaison
  • Per-address records
  • Remediation programmes

Social housing and estate programmes prices in Hampshire

Social housing and estate programmes guide prices
Social housing and estate programmes guide pricesGuide price
Commercial cavity fill, per m² (+VAT)£22–£36
Access towers or MEWP, per day (+VAT)£195–£495

No VAT is charged on installing insulation in homes until 31 March 2027 (then 5%). Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.

What happens next for a Hampshire property:

  1. Tell us about the property

    Postcode, property type and what you need.

  2. Free survey

    Walls, cavity, condition and exposure checked and photographed.

  3. Written result and price

    Suitable, suitable after repairs, or not suitable, with a fixed price.

  4. Work and paperwork

    Installation, making good, and the regulations and guarantee paperwork.

Last reviewed 19 October 2026.

Social housing and estate programmes in Hampshire: questions

Do you cover all of Hampshire?

Yes. We cover 18 towns across Hampshire, including Southampton, Portsmouth, Basingstoke and Gosport, and the villages around them. Island and remote addresses are surveyed by arrangement.

Is there VAT on social housing and estate programmes in Hampshire?

Installing insulation in a home is currently zero-rated for VAT until 31 March 2027, then 5%. Commercial buildings are standard-rated.

How soon can you visit in Hampshire?

We arrange dates when you get in touch. Availability varies through the year, so we give you real dates rather than a promise on the website.

How much does social housing and estate programmes cost in Hampshire?

Our guide ranges for social housing and estate programmes are shown on this page. The fixed price for your Hampshire property is confirmed in writing after the survey, before any work starts.

Social housing and estate programmes in nearby areas

Book a free survey in Hampshire

Free survey with an install quote. Written result. Fixed price before any work.