Cavity insulation for new builds and extensions across Dorset
We cover 4 towns in Dorset: Bournemouth, Poole, Weymouth and Christchurch.
Before any material is chosen, exposure is checked. Dorset has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.
A suitable wall in Dorset is usually filled in a single day from outside, with drill holes made good to match the pointing. Dorset properties with rendered or painted walls get a closer look at the outer finish, because cracked render can let rain behind it.
Building Regulations in England
Filling an existing cavity wall is notifiable building work in England. Either a building notice goes to building control before the work, or the installer self-certifies it through a government-approved competent person scheme such as CIGA's CWISC scheme. The insulation used must also be suitable for the wall it goes into, which is why the survey checks construction, condition and exposure first.
Funding in England
- ECO4, the energy-supplier scheme, has been extended to 31 December 2026 and government has said there will be no successor supplier obligation.
- The Great British Insulation Scheme closed as planned on 31 March 2026.
- Warm Homes: Local Grant supports low-income households in England through councils, and the January 2026 Warm Homes Plan sets out fully funded upgrades for low-income homes, with more detail still being published.
Sources: Planning Portal: cavity wall insulation and building regulations; CIGA: CWISC competent person scheme; GOV.UK: extending the ECO4 end date, government response; GOV.UK: Warm Homes Plan.
What we work from
Your architect's or designer's specification and the energy calculation for the job. We match the product, thickness and fixing to that spec, keep cavities clean as the walls rise, and fit cavity trays, closers and stop ends where shown so the building control inspection goes smoothly.
What is included
- Batts or boards to the specified U-value
- Clean-cavity working
- Trays, closers and stop ends as drawn
- Coordination with your bricklayers
- Photo record for building control
Cavity insulation for new builds and extensions prices in Dorset
| Cavity insulation for new builds and extensions guide prices | Guide price |
|---|---|
| Full-fill batts supplied and fitted, per m² | £9–£16 |
| Partial-fill boards supplied and fitted, per m² | £14–£26 |
Prices are shown before any VAT; the VAT treatment for new-build work is confirmed on your quote. Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
How it works in Dorset:
Send your details
A minute online, or call the free number.
We check the walls
Construction, cavity width, debris, damp and wind-driven rain exposure.
You decide
Plain-English result and a fixed price, with no pressure to book.
Job done properly
Holes made good, paperwork handed over, guarantee details confirmed.
