Damp investigation after cavity insulation across West Yorkshire
We cover 19 towns in West Yorkshire, including Leeds, Bradford, Huddersfield, Wakefield, Halifax and more.
Exposure matters for every cavity wall. West Yorkshire has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.
If your West Yorkshire installation has a guarantee, we check it first; the guarantee route may cover the work. Where a West Yorkshire wall does need work, bricks are lifted and rebuilt in matching mortar, and the cavity is checked with a camera before it is closed up.
Building Regulations in England
Filling an existing cavity wall is notifiable building work in England. Either a building notice goes to building control before the work, or the installer self-certifies it through a government-approved competent person scheme such as CIGA's CWISC scheme. The insulation used must also be suitable for the wall it goes into, which is why the survey checks construction, condition and exposure first.
Sources: Planning Portal: cavity wall insulation and building regulations; CIGA: CWISC competent person scheme.
Common causes we check
Defective pointing, cracked render and porous bricks letting rain in; leaking gutters and downpipes; fill bridging the cavity where mortar droppings or debris have collected; ground levels above the damp-proof course; and condensation from cooking, drying clothes and too little ventilation.
What is included
- Moisture mapping inside
- External defects check
- Borescope at affected areas
- Cause and options in writing
Damp investigation after cavity insulation prices in West Yorkshire
| Damp investigation after cavity insulation guide prices | Guide price |
|---|---|
| Damp investigation with borescope | £295–£495 |
This work is not insulation, so it is normally standard-rated for VAT. Guide prices include VAT where it applies. Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
What happens next for a West Yorkshire property:
Tell us what is happening
Postcode, property type and what you have noticed.
Price agreed first
We confirm the price before anyone visits.
Visit and checks
Photos and readings at the areas that matter.
Findings in writing
What we found and the options, each priced separately.
