What is different on commercial jobs
Access is planned around opening hours, often with towers or MEWPs. Material choice takes account of building use and fire requirements, so non-combustible mineral wool is often specified. Work is usually standard-rated for VAT unless the building qualifies for a relief, which we confirm on the quote.
What is included
- Survey and specification
- Access and method statement
- Out-of-hours working where needed
- O&M information
Commercial cavity wall insulation prices
| Commercial cavity wall insulation guide prices | Guide price |
|---|---|
| Commercial cavity fill, per m² (+VAT) | £22–£36 |
| Access towers or MEWP, per day (+VAT) | £195–£495 |
Commercial prices are shown plus VAT where it applies. Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
Rules and funding by nation
The building regulations route and the funding schemes differ between England, Wales, Scotland and Northern Ireland. The local pages for your area explain the rules where you are; in short:
- England: Filling a cavity is notifiable building work and needs a building notice or competent-person self-certification.
- Wales: Filling a cavity is notifiable work under the Building Regulations as they apply in Wales, usually self-certified through a competent person scheme.
- Scotland: No building warrant is needed for insulation within a wall, but the work must meet the building standards.
- Northern Ireland: Inserting cavity wall insulation needs a building control application to the council before work starts.
Sources: Energy Saving Trust: cavity wall insulation; Planning Portal: cavity wall insulation and building regulations; Welsh Government: building work competent person schemes; HMRC: VAT on energy-saving materials (Notice 708/6).
