Social housing and estate programmes for Wigan properties
Our Greater Manchester coverage takes in Wigan (WN1) and nearby Ashton in Makerfield, Westhoughton and Leigh. It is about 17 miles west of Manchester.
For landlords and managing agents in Wigan, we survey in batches and return a result sheet and fixed price per address. For commercial buildings in Wigan, the survey also considers building use and fire requirements before a material is specified.
Every elevation is judged on its own exposure. Greater Manchester has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.
As for paperwork, in Wigan filling a cavity is notifiable building work and needs a building notice or competent-person self-certification.
Funding in England
In England, ECO4 runs to 31 December 2026 and Warm Homes: Local Grant supports low-income households through councils.
Sources: GOV.UK: extending the ECO4 end date, government response; GOV.UK: Warm Homes Plan.
Quality after ECO
The National Audit Office's October 2025 report found serious failings in some government-funded installs. We work survey-first, record every stage, and name the installer and guarantee on each order.
What is included in Wigan
- Resident liaison
- Remediation programmes
- Stock and archetype surveys
- Per-address records
Guide prices for Wigan
| Social housing and estate programmes guide prices | Guide price |
|---|---|
| Commercial cavity fill, per m² (+VAT) | £22–£36 |
| Access towers or MEWP, per day (+VAT) | £195–£495 |
No VAT is charged on installing insulation in homes until 31 March 2027 (then 5%). Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
How it works in Wigan:
Tell us about the property
Postcode, property type and what you need.
Free survey
Walls, cavity, condition and exposure checked and photographed.
Written result and price
Suitable, suitable after repairs, or not suitable, with a fixed price.
Work and paperwork
Installation, making good, and the regulations and guarantee paperwork.