Cavity wall suitability survey for Oban properties
We cover Oban and the PA34 postcode district, including nearby Dunoon and Helensburgh. It is around 39 miles north-west of Helensburgh.
Where an Oban wall shows cold patches or damp, the survey targets those areas first rather than sampling at random. Buyers and sellers in Oban often book this check when a survey report or EPC raises questions about the walls.
Exposure matters for every cavity wall. Parts of Argyll and Bute face some of the heaviest wind-driven rain in the UK, especially exposed coastal and upland sites. Here the survey is stricter: some walls suit only certain certified systems, and some should not be filled at all.
In terms of approvals, in Oban no building warrant is needed for insulation within a wall, but the work must meet the building standards.
Rules in Scotland
No building warrant is needed for insulation within a wall, but the work must meet the building standards if insulation work follows.
Sources: Scottish Government: building work not requiring a warrant (schedule 3).
What the surveyor checks
Wall construction and thickness at window reveals; cavity width and debris with a borescope; brickwork, pointing, render, sills, gutters and downpipes; signs of damp inside and out; air bricks and flues; joins with neighbours and extensions; and the exposure of each elevation to wind-driven rain.
What is included in Oban
- Fixed install price where suitable
- Exposure assessment by elevation
- Repairs list where needed
- Photo-backed written result
Guide prices for Oban
| Cavity wall suitability survey guide prices | Guide price |
|---|---|
| Suitability survey with an install quote | Free |
| Standalone survey report (no install quote) | £145–£245 |
The survey is free with an install quote. A standalone report is not insulation, so it is normally standard-rated for VAT; guide prices include VAT. Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
The steps for a cavity wall survey in Oban:
Tell us about the property
Postcode, property type and why you need the survey.
Survey visit
Walls, cavity, condition and exposure checked and photographed.
Written result
Suitable, suitable after repairs, or not suitable.
Fixed price if you want work
The survey is free when it is for an install quote.