Cavity insulation top-up for Perth properties
We cover Perth and the PH2 postcode district, including nearby Dundee, Forfar and Arbroath. It is about 18 miles west of Dundee.
Most Perth houses built from the 1920s onwards have cavity walls, but the survey still checks each one: cavity width, debris, the condition of the brickwork and how exposed each wall is. A suitable wall in Perth is usually filled in a single day from outside, with drill holes made good to match the pointing.
Exposure matters for every cavity wall. Tayside has a mix of moderate and more exposed sites. Hilltop, coastal and west-facing walls take the brunt of wind-driven rain, so the survey records exposure for each elevation before a material is chosen.
For regulations, in Perth no building warrant is needed for insulation within a wall, but the work must meet the building standards.
Funding in Scotland
In Scotland, Home Energy Scotland is the route to the Home Energy Scotland Grant and Loan and Warmer Homes Scotland.
Sources: Home Energy Scotland; mygov.scot: grants and loans for energy saving improvements.
How do I know if my walls need a top-up?
Cold patches on internal walls, a thermal image showing uneven heat loss, or an EPC that says 'filled cavity' when parts of the house feel colder are all signs. Extensions are a common cause: the new wall is insulated as built, but the old wall it joins may have been left partly empty.
What is included in Perth
- Making good
- Written result with photos
- Borescope survey at several points
- Targeted fill with a compatible system
Guide prices for Perth
| Cavity insulation top-up guide prices | Guide price |
|---|---|
| Detached house | £1,295–£2,295 |
| Semi-detached house | £795–£1,495 |
| End-terrace house | £695–£1,295 |
| Detached bungalow | £695–£1,295 |
| Semi-detached bungalow | £595–£995 |
| Mid-terrace house | £595–£995 |
No VAT is charged on installing insulation in homes until 31 March 2027 (then 5%). Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
What happens next for a Perth property:
Tell us about the property
Postcode, property type and what you need.
Free survey
Walls, cavity, condition and exposure checked and photographed.
Written result and price
Suitable, suitable after repairs, or not suitable, with a fixed price.
Work and paperwork
Installation, making good, and the regulations and guarantee paperwork.