Cavity insulation top-up across County Londonderry
We cover 4 towns in County Londonderry: Derry, Coleraine, Limavady and Magherafelt.
Before any material is chosen, exposure is checked. Parts of County Londonderry face some of the heaviest wind-driven rain in the UK, especially exposed coastal and upland sites. Here the survey is stricter: some walls suit only certain certified systems, and some should not be filled at all.
Where a County Londonderry property has an extension or a conservatory, we check how the old and new walls meet, because that junction is often missed. Most County Londonderry houses built from the 1920s onwards have cavity walls, but the survey still checks each one: cavity width, debris, the condition of the brickwork and how exposed each wall is.
Building control in Northern Ireland
In Northern Ireland, inserting insulation into an existing cavity wall needs a building control application to your council before the work. We make sure the application route is agreed and confirmed in writing before any drilling starts.
Funding in Northern Ireland
- The Affordable Warmth Scheme, run with the NI Housing Executive, helps owner-occupiers and private tenants with a total gross household income under £23,000; cavity wall insulation is a priority measure where suitable.
- The NI Sustainable Energy Programme funds energy efficiency schemes through participating providers.
- ECO4 does not apply in Northern Ireland.
Sources: Building Control NI: frequently asked questions; Belfast City Council: what are the building regulations; NI Housing Executive: Affordable Warmth Scheme; Utility Regulator: NI Sustainable Energy Programme.
How do I know if my walls need a top-up?
Cold patches on internal walls, a thermal image showing uneven heat loss, or an EPC that says 'filled cavity' when parts of the house feel colder are all signs. Extensions are a common cause: the new wall is insulated as built, but the old wall it joins may have been left partly empty.
What is included
- Borescope survey at several points
- Map of filled and empty sections
- Targeted fill with a compatible system
- Making good
- Written result with photos
Cavity insulation top-up prices in County Londonderry
| Cavity insulation top-up guide prices | Guide price |
|---|---|
| Detached house | £1,295–£2,295 |
| Semi-detached house | £795–£1,495 |
| End-terrace house | £695–£1,295 |
| Detached bungalow | £695–£1,295 |
| Semi-detached bungalow | £595–£995 |
| Mid-terrace house | £595–£995 |
No VAT is charged on installing insulation in homes until 31 March 2027 (then 5%). Guide ranges only: the fixed price is confirmed in writing before any work starts, and anything that could not be seen at survey is agreed with you first.
How it works in County Londonderry:
Get in touch
Online, by phone or WhatsApp, whichever suits you.
Survey visit
The surveyor checks each wall and looks into the cavity where needed.
Your result in writing
What we found, what it means, and a fixed price if work is needed.
Booked work
Carried out by the installer named on your quote, with their scheme registrations.
